T.C. Ministry of Public
Works |
İzmit Döngel 708 Houses
Project
|
|
|
| A
turnkey, lump-sum contracted project of the Ministry of
Public Works' Earthquake Houses. The construction of 70
blocks with 708 houses by tunnel-mould system. The total
construction area is 87.082 m2. The project duration was
258 days. 43.000 m3 concrete, 2.500 tons of steel was
used |
| |
|
|
|
|
|