T.C. Ministry of Public Works

İzmit Döngel 708 Houses Project

A turnkey, lump-sum contracted project of the Ministry of Public Works' Earthquake Houses. The construction of 70 blocks with 708 houses by tunnel-mould system. The total construction area is 87.082 m2. The project duration was 258 days. 43.000 m3 concrete, 2.500 tons of steel was used
 