Construction of Gaziosmanpaşa-Çukurçeşme
Overhead Junction |
|
|
|
Construction of the overhead junction inclıded 100.000 m3 excavation, 1559 pieces of and 19.500 m long fore piles, coating of the hub in front of the fore piles with 8000 m2 of elevation panels and 541 pieces of precast I - pillars. The overhead junction, together with its TEM connection consisting of 5 main connections, provided a continous solution for the traffic problems from which the region suffers |
| |
|
|
|
|
|